BMDESIGN Studio

Principal

Babak Mostofi Sadri / bmsadri@gmail.com

Education

University of Tehran, Tehran, Iran

M.Sc. in Environmental Design Engineering (Landscape Architecture)

Thesis: “Renovation of rural areas in Kogilouieh province based on agro-tourism model, Pilot Project: Kariak Village

MEMBER OF AMERICAN SOCIETY OF LANDSCAPE ARCHITECTURE

 

Team

BABAK SADRI LEAD DESIGNER

NAZANIN TEHRANI PROJECT MANAGER DESIGNER

DENA BAKHTIARI PROJECT MANAGER DESIGNER

MARZIEH REZAZADEH ARCHITECT

NEGAR NAGHIB SADAT PROJECT MANAGER DESIGNER

SUMMERY OF PROFESSIONAL EXPERIENCE AND EMPLOYMENT HISTORY

BMDesign office, Tehran , Iran 2014 - 2015

01. Ava Khazar development, Mahmoud Abad, Iran (33.000m2)
Responsible for masterplanning, preparing SD and DD drawings of Civil, Mechanical and Electrical and Landscape. Under Construction.

02. Bidsar development, Damavand, Iran (270.000m2)
Responsible for masterplanning, preparing SD and DD drawings of Civil, Mechanical and Electrical and Landscape. Under Construction.

03. Saloor Villa, Chalus, Iran (1.400m2)
Responsible for designing and supervising garden's hard and soft Landscape. Completed.

04. Behrang Residence, Darous, Tehran, Iran
Responsible for designing garden's hard and soft Landscape and the Entrance Gate. Under Construction.

05. Hormozan Garden Residence, Sharak Gharb, Tehran, Iran
Responsible for designing and supervising garden's soft Landscape. Completed.

06. Dr Hosseini Villa, Sarbandan, Tehran , Iran
Responsible for designing and supervising building’s Landscape

BMDesign office, Tehran , Iran 2010 - 2014

01. IKIA Airport City, Landscape Masterplanning (14,000 Hectares)
Responsible for extensive coordination with NikkenSekkei Ltd of Japan, to provide local data, example specifications, make submissions to the Local Authorities and contribute in the design process.
IkIA airport city would be Iran's first Airport city and one of the biggest in the world after completion.

02. Amir Villa, Karaj Iran(1000m2)
Responsible for designing and supervising garden's Landscape. Completed.

03. Koohsar Villa, Kordan Iran (5000m2)
Responsible for designing and supervising garden's Landscape.Completed.

04. Spring community and Palm Villas, Dubai UAE
Responsible for Landscape schematic and detail design of 8 Villas .Under construction.

05. APARTMENTS 674, Mehrshahr, Karaj, Iran
Responsible for designing and supervising garden's Landscape. Completed.

06. 5 Esfand Recreational Complex, Mehrshahr, Ghazvin, Iran (23000m2)
Responsible for designing Site’s Landscape. Phase 1. Completed.

07. Sharifiha house, Tehran, Iran
Responsible for designing and supervising building’s Landscape interior/exterior.Completed.

08. Vafa garden, Tehran, Iran (5000sqm)
Responsible for designing and supervising garden’s Landscape interior/exterior.

09. Behrang residential complex, Darous, Tehran, Iran
Responsible for designing and supervising building’s Landscape interior/exterior.

10. 912 Apartments, Kamranieh, Tehran, Iran
Responsible for designing and supervising building’s Landscape interior/exterior.

11. Tatilat Hotel, Kish Island, Iran (1500sqm)
Responsible for designing and supervising Hotel’s Landscape interior/exterior.
12. Dr Jafari’s Villa, Lavasan, Tehran, Iran
Responsible for designing and supervising building’s Landscape (interior/exterior.)

Mouchel international, Mouchel, UAE 2007 - 2009

Senior Landscape Architect

01. Al Hayer Park, Al Ain (80 Million AED)
Responsible for bidding and designing of the park. Mouchel have been short listed by the client.

02. Al Wasl City, Riyadh , KSA (4 Billion AED)
Responsible for extensive coordination between different disciplines within the Mouchel and the project's landscape masterplanner (SWA Group). Also, responsible for preparing schematic documentation of 27 Pocket Parks within the development.

03. AL Khalidiyah Park, Abu Dhabi
Responsible for preparing the renovation plans and 3D models of the park. Also responsible for liaising with the Mouchel QS team in order to prepare the cost estimation.

04. Al Ghadeer City, AbuDhabi
Responsible for coordinating of the Landscape work between Mouchel Dubai Team and Mouchel Abu Dhabi Office in the schematic design phase of the project and involved in the design of the open spaces.

05. Madinat Al Arab Waterfront, Dubai
Responsible for the detail design of hard and soft landscape of streetscapes for phase 1, phase 3, Al Oud and Canal District East & West. Waterfront development is over 2000 hectares and will cater for a population of 1.7 million people. It also includes a 10km navigable canal and harbour.

Prior to this Babak Sadri worked in Rahshahr Architects from 2003-2007 and Fardano from 1999-2003
Loading...

Whoops, looks like something went wrong.

1/1 ErrorException in Filesystem.php line 111: file_put_contents(): Only 0 of 270 bytes written, possibly out of free disk space

  1. in Filesystem.php line 111
  2. at HandleExceptions->handleError('2', 'file_put_contents(): Only 0 of 270 bytes written, possibly out of free disk space', '/home/bmsadric/public_html/vendor/laravel/framework/src/Illuminate/Filesystem/Filesystem.php', '111', array('path' => '/home/bmsadric/public_html/storage/framework/sessions/XED9TM1a73UOjamHYDcJj0I8jiE303MPdUMIKqWJ', 'contents' => 'a:4:{s:6:"_token";s:40:"vGrAcNL2hIhw54YPOgqAirEtCDoDfMMe5zgpbPqx";s:9:"_previous";a:1:{s:3:"url";s:32:"http://bmdesignstudios.com/about";}s:9:"_sf2_meta";a:3:{s:1:"u";i:1511119906;s:1:"c";i:1511119906;s:1:"l";s:1:"0";}s:6:"_flash";a:2:{s:3:"old";a:0:{}s:3:"new";a:0:{}}}', 'lock' => true))
  3. at file_put_contents('/home/bmsadric/public_html/storage/framework/sessions/XED9TM1a73UOjamHYDcJj0I8jiE303MPdUMIKqWJ', 'a:4:{s:6:"_token";s:40:"vGrAcNL2hIhw54YPOgqAirEtCDoDfMMe5zgpbPqx";s:9:"_previous";a:1:{s:3:"url";s:32:"http://bmdesignstudios.com/about";}s:9:"_sf2_meta";a:3:{s:1:"u";i:1511119906;s:1:"c";i:1511119906;s:1:"l";s:1:"0";}s:6:"_flash";a:2:{s:3:"old";a:0:{}s:3:"new";a:0:{}}}', '2') in Filesystem.php line 111
  4. at Filesystem->put('/home/bmsadric/public_html/storage/framework/sessions/XED9TM1a73UOjamHYDcJj0I8jiE303MPdUMIKqWJ', 'a:4:{s:6:"_token";s:40:"vGrAcNL2hIhw54YPOgqAirEtCDoDfMMe5zgpbPqx";s:9:"_previous";a:1:{s:3:"url";s:32:"http://bmdesignstudios.com/about";}s:9:"_sf2_meta";a:3:{s:1:"u";i:1511119906;s:1:"c";i:1511119906;s:1:"l";s:1:"0";}s:6:"_flash";a:2:{s:3:"old";a:0:{}s:3:"new";a:0:{}}}', true) in FileSessionHandler.php line 83
  5. at FileSessionHandler->write('XED9TM1a73UOjamHYDcJj0I8jiE303MPdUMIKqWJ', 'a:4:{s:6:"_token";s:40:"vGrAcNL2hIhw54YPOgqAirEtCDoDfMMe5zgpbPqx";s:9:"_previous";a:1:{s:3:"url";s:32:"http://bmdesignstudios.com/about";}s:9:"_sf2_meta";a:3:{s:1:"u";i:1511119906;s:1:"c";i:1511119906;s:1:"l";s:1:"0";}s:6:"_flash";a:2:{s:3:"old";a:0:{}s:3:"new";a:0:{}}}') in Store.php line 263
  6. at Store->save() in StartSession.php line 88
  7. at StartSession->terminate(object(Request), object(Response)) in Kernel.php line 177
  8. at Kernel->terminate(object(Request), object(Response)) in index.php line 58